Client

Cost Estimates

TRC’s formula for analysis and cost estimating will be based on our first-hand knowledge of current labour/material/overhead and profit rates gathered from the contractors and suppliers we work with every day as well as data compiled through industry resources for current pricing trends, historical data and local conditions:

Project Types:

  • Concrete restoration – estimate of probable repair costs
  • Balconies / catwalks / decks
  • Post-tension repair
  • Drainage and water damage
  • Waterproofing – roofs, decks, balconies, building envelope
  • Parking structures
  • Pool and pool decks
  • Seawalls / retaining walls
  • Roof systems
  • Concrete Masonry Unit (CMU) repair / replacement
  • Stucco – evaluation and repair/replacement
  • High-rise special considerations, mid-rise facades
  • Ramps, bridges, other concrete structures